Media Center Office Building Project

4 Documents in Project

Summary

SCH Number
2014081021
Lead Agency
El Monte, City of (City of El Monte)
Document Title
Media Center Office Building Project
Document Type
NOD - Notice of Determination
Received

Document Description
The overall project consists of the following phases: demolition of existing structures; construction of the new Media Center office building with a conference center; remodeling of one existing structure as a print shop; remodeling of a second structure for use as a warehouse; construction of the parking lot; construction of a Chinese Tea House and Gazebo; and construction of a new bridge across Rubio Wash to connect the site to Rosemead Boulevard. Once all facilities are constructed, the Media Center Office complex would contain approximately 98,088 square feet. An assembly area for the conference center would have a maximum occupancy to 250 persons. The City of El Monte entitlements required to implement the proposed project include the following: a Lot Division (Tentative Parcel Map) to consolidate four parcels into one parcel, a Conditional Use Permit (CUP) for a multiple-tenant development; Design Review for the building's architecture and site's conceptual landscaping; and a Modification to reduce the loading requirements. It is approval of these permits by the City that would allow the construction and operation of the proposed project to proceed.

Contact Information
Jason Mikaelian
City of El Monte
11333 Valley Boulevard
El Monte, CA 91731

626-580-2064

Location

Coordinates
34°3'50"N 118°4'7"W
Cities
El Monte
Counties
Los Angeles
Cross Streets
Rosemead Blvd (SH 19) and Garvey Avenue
Zip
91732
Total Acres
5.92
State Highways
Hwy 19
Waterways
Rubio Wash
Township
1S
Range
11W
Base
SBB&M

Notice of Determination

Approving Agency
City of El Monte
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
City of El Monte, 11333 Valley Boulevard, El Monte, CA 91731

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
N/A