Salinas Regional Soccer Complex

3 Documents in Project

Summary

SCH Number
2014081020
Lead Agency
City of Salinas
Document Title
Salinas Regional Soccer Complex
Document Type
NOD - Notice of Determination
Received
Posted
11/24/2014
Present Land Use
Vacant GPD: Parks, Public/Semipublic, and Open space Z: Public/Semipublic (PS), Park, and OS
Document Description
The project includes eight turf soccer fields; an outdoor, 2,000 seat, lighted stadium with two synthetic soccer fields; an approximately 35,000 square-foot indoor soccer arena with concessions, classrooms, maintenance facilities, etc.; an outdoor sports court; an outdoor bathroom facility; 421 new parking spaces; pedestrian walkways; an on-site water well to provide irrigation water for the proposed turf fields and for existing fields located adjacent to the site; storm water control facilities including LID features and infiltration basins; setbacks from riparian/wetland resources associated with the adjacent Gabilan Creek and an adjacent drainage ditch; and minor compensatory wetland restoration. The project site would be leased to the non-profit Salinas Regional Sports Authority by the City of Salinas. The Salinas Regional Sports Authority would construct and operate the facility.

Contact Information

Name
Courtney Grossman
Agency Name
City of Salinas
Contact Types
Lead/Public Agency

Location

Cities
Salinas
Counties
Monterey
Cross Streets
East Laurel Drive/Constitution Blvd
State Highways
Hwy 101
Airports
Salinas Municipal
Schools
Multiple
Waterways
Gabilan Creek, Reclamation Ditch, Carr Lake

Notice of Determination

Approving Agency
City of Salinas
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes