Temple City High School Facilities Master Plan Project
Summary
SCH Number
2014081006
Lead Agency
Temple City Unified School District
Document Title
Temple City High School Facilities Master Plan Project
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
High School; R-1 (Single-Family Residential): Institutional
Document Description
Note: Shortened Review
The project would demolish two single-story classroom buildings in order to construct a larger three two-story classroom buildings within the Temple City High School campus. The project would replace the existing athletic field, bleachers, press box, public address system, concession stand, and restroom buildings at the existing stadium; remove a softball field; demolish an existing swimming pool; and build a replacement swimming poolin the west part of the campus of the site of the softball field to be removed.
Contact Information
Name
Daniel Rodriguez
Agency Name
Temple City Unified School District
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Counties
Los Angeles
Cross Streets
Lemon Avenue at Temple City Boulevard
Zip
91780
Total Acres
25
Parcel #
5382-013-903
State Highways
I-210; 19
Railways
Metro Gold Line; UPRR
Airports
No
Schools
Various
Waterways
Eaton Wash, Rubio Wash
Township
1S
Range
11W
Section
4/6
Base
SBB&M
Notice of Completion
State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Fish and Wildlife, South Coast Region 5 (CDFW), California Department of Parks and Recreation, California Department of Transportation, District 7 (DOT), California Highway Patrol, California Native American Heritage Commission (NAHC), California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, Los Angeles Region 4 (RWQCB), Department of Toxic Substances Control, Department of Water Resources, Office of Historic Preservation, Resources Agency, Resources, Recycling and Recovery
Development Types
Other (School Buildings, atheletic facilities improvements)
Local Actions
School Improvements
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire, Wildlife
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.