Sprint Embarcadero Marina Park South Telecommunications Project
3 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2014081004
- Lead Agency
- San Diego Unified Port District
- Document Title
- Sprint Embarcadero Marina Park South Telecommunications Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 6/22/2017
- Present Land Use
- Park/Plaza
- Document Description
- The project involves modifications to an existing Sprint Wireless telecommunications facility in Embarcadero Marina Park South (EMPS) in the City of San Diego. An addendum to the Spring EMPS Telecommunications Project Neg. Dec. was warranted based on the proposed modifications. Verizon Wireless proposed to "collocate" on the existing cellular tree by installing additional cellular equipment onto the existing cellular tower, constructing a new equipment room adjacent to the existing Sprint Wireless equipment room, and installing ancillary equipment and utilities to operate the facility. Work to complete the proposed project would not increase the height of the existing faux tree.
- Contact Information
-
Ashley Wright
San Diego Unified Port District
3165 Pacific Hwy
San Diego, CA 92101
Phone : (619) 686-6549
Location
- Coordinates
- 32°42'20"N 117°9'39"W
- Cities
- San Diego
- Counties
- San Diego
- Cross Streets
- Marina Park Way / Convention Way
- Zip
- 92101
- Total Acres
- .1
- Parcel #
- 019-008
- State Highways
- I-5
- Railways
- BNSF
- Airports
- SDIA
- Schools
- Monarch School
- Waterways
- San Diego Bay
Notice of Determination
- Approving Agency
- San Diego Unified Port District
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- 3165 Pacific Hwy, San Diego, CA 92101
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- No
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.