PA-1400111 (SA)
2 Documents in Project
Summary
SCH Number
2014072070
Lead Agency
San Joaquin County
Document Title
PA-1400111 (SA)
Document Type
NOD - Notice of Determination
Received
Posted
10/6/2014
Present Land Use
Vinegar production facility/ AG-40 / A/G
Document Description
A Site Approval application of Ken Kramer (c/o Mike Smith Engineering, Inc.) to utilize a portion of an existing vinegar processing facility to establish a small winery. Phase 1 includes utilizing a 510-square-foot portion of an existing vinegar production building for wine production, utilizing a 400-square-foot portion of an existing olive oil tasting room for wine tasting, utilizing a 450-square-foot storage area for wine storage, and the construction of a 500-square-foot crush pad. Phase 2, with building permits to be issued within 10 years, includes the use of 3,000 square feet of a previously approved 5,000-square-foot vinegar storage building proposed with PA-1000273. No marketing events are proposed with this application. This parcel is not under a Williamson Act contract. The Property is zoned AG-40 (General Agriculture, 40-acre minimum) and the General Plan designation is A/G (General Agriculture).
Contact Information
Name
Sonia Serrano
Agency Name
San Joaquin County
Contact Types
Lead/Public Agency
Phone
Location
Cities
Lodi
Counties
San Joaquin
Cross Streets
Thorton Road & Barber Road
Zip
95686
Parcel #
001-130-04
State Highways
I-5
Railways
UPRR
Other Location Info
Thorton
Notice of Determination
Approving Agency
San Joaquin County Community Development
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.