Tahoe Basin Area Plan

7 Documents in Project

Summary

SCH Number
2014072039
Lead Agency
Placer County
Document Title
Tahoe Basin Area Plan
Document Type
NOD - Notice of Determination
Received
Posted
12/13/2016
Present Land Use
As specified in existing general plans, community plans, and plan area statements
Document Description
The Plan will become a component of the Lake Tahoe Regional Plan and the Placer County General Plan. It will serve as the policy plan and regulatory structure replacing the existing West Shore, Tahoe City Area, and North Tahoe Area General Plans; the Tahoe City, Carnelian Bay, Tahoe Vista, Kings Beach, Kings Beach Industrial, and CA North Stateline Community Plans; 51 Plan Area Statements (PAS); the Placer County Standards & Guidelines for Signage, Parking and Design; and the Placer County Code Chapter 17, Article 17.02 Section 17.02.050 (D) and Article 17.56, Section 17.56.202 and Appendices B, C, D, and F. Zoning implementation is proposed through an ordinance to rezone properties within the Area Plan area as necessary and required to achieve consistency with the proposed Area Plan land use designation.

Contact Information

Name
Shirlee Herrington
Agency Name
Placer County and TRPA
Contact Types
Lead/Public Agency

Location

Counties
Placer
Cross Streets
Includes all of County within the Tahoe Basin, and ~4 acre lodge site
Zip
96145
Total Acres
50000
Parcel #
Numerous
State Highways
SR 28, 89, 267
Schools
Numerous
Waterways
Lake Tahoe, Truckee River, Blackwood Cr., etc.
Other Location Info
Kings Beach and Tahoe City

Notice of Determination

Approving Agency
Placer County
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print