Caroline Lane / Winter Moon Way Water Line Extension Project

2 Documents in Project

Summary

SCH Number
2014072038
Lead Agency
Nevada Irrigation District
Document Title
Caroline Lane / Winter Moon Way Water Line Extension Project
Document Type
NOD - Notice of Determination
Received
Posted
9/5/2014
Present Land Use
Nevada County right-of-way LU: Rural 5 acre
Document Description
As part of the District-Financed Waterline Extension Program (DFWLE), NID proposes to install a treated water pipeline along Winter Moon Way and Caroline Lane on Banner Mountain. The proposed Caroline Lane / Winter Moon Way DFWLE Project would include the construction and operation of an approximately 2,100-foot long 8-inch waterline that runs along Caroline Lane and Winter Moon Way. It would connect to an existing 12-inch water main at the intersection of Caroline Lane and Banner Lava Cap Road. The pipeline would be constructed within the existing road and roadway shoulder and include air release valves, blow-off valves, fire hydrants, and metered service assemblies.

Contact Information

Name
Todd Jordan
Agency Name
Nevada Irrigation District
Contact Types
Lead/Public Agency

Location

Cities
Nevada City
Counties
Nevada
Cross Streets
Banner Lava Cap Road, Caroline Lane, and Winter Moon Way
Zip
95959
Total Acres
.5
State Highways
Hwy 49/20
Airports
Nevada County Airpark
Waterways
Little Deer Creek
Township
16N
Range
9E
Section
21

Notice of Determination

Approving Agency
Nevada Irrigation District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes