Delta Coves Utility Project (Lake or Streambed Alteration Agreement No. 1600-2014-0425-R3)

4 Documents in Project

Summary

SCH Number
2014072026
Lead Agency
Diablo Water District
Document Title
Delta Coves Utility Project (Lake or Streambed Alteration Agreement No. 1600-2014-0425-R3)
Document Type
NOD - Notice of Determination
Received
Posted
3/20/2015
Present Land Use
No changes
Document Description
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement number 1600-2014-0425-R3, pursuant to section 1602 of the Fish and Game Code to the project Applicant, SDC Delta Coves, LLC. The project is limited to the installation of a 1,083-foot-long pipeline using the horizontal directional drilling (HDD) method. The pipe consists of a 16-inch fused polyvinyl chloride (PVC) sleeve pipe with a fused 12-inch PVC pipe paced inside. The entry pit (10'L x 5'W x 6'H) will be excavated approximately 50 feet south of the right of way at the Delta Coves Drive cul-de-sac. The exit pit (10'L x 5'W x 4.5'H) will be excavated approximately 160 feet north of the Windsweep Road right of way. Adequate space must be provided at the pits for staging construction operations.

Contact Information

Name
Crystal Spurr
Agency Name
CDFW Bay Delta Region
Contact Types
Lead/Public Agency

Location

Cities
Oakley
Counties
Contra Costa
Cross Streets
Bethal Island Road / East Cypress Road / Sandy Land
Zip
94561
Railways
Amtrack
Schools
Delta Valley MS
Waterways
Dutch Slough
Township
2-4N
Range
3E
Section
Multi
Other Location Info
Bethal Island

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No