Delta Coves Utility Project

4 Documents in Project

Summary

SCH Number
2014072026
Lead Agency
Diablo Water District
Document Title
Delta Coves Utility Project
Document Type
NOD - Notice of Determination
Received
Posted
9/2/2014
Present Land Use
No changes
Document Description
The main objective of the Delta Coves Utility Project (the "Project") is to servce the future residents of Delta Coves with potable water for domestic and fire suppression purposes and natural gas from the PG&E gas pipeline. Additionally the new trunk line will provide water for new fire hydrants to be installed along Bethel Island Road between the Bethel Island Bridge and Sandy Lane. The Delta Coves EIR provided analysis for up to 498 single family dwellings, 110 condominium units, and associated commercial/recreational area, and is located entirely within the service boundary of the Diablo Water District (DWD). The final map for the Delta Coves community currently includes 494 single-family dwellings, and 66 condominium units. DWD will provide potable water, and Pacific Gas & Electric Company (PG&E) will provide natural gas service to Delta Coves and Bethel Island through completion of the following components of the Delta Coves Utility Project: 1) Delta Coves Off-Site Water Trunkline, 2) Delta Coves Off-Site Gas Pipeline, 3) Chloramination Plant, 4) Pump Station, 5) Water Reservoir, 6) Bridge Crossing, and 7) Completion of Water Line Loop (on-Site) within Delta Coves.

Contact Information

Name
Mike Yeraka
Agency Name
Diablo Water District
Contact Types
Lead/Public Agency

Location

Cities
Oakley
Counties
Contra Costa
Cross Streets
Bethal Island Road / East Cypress Road / Sandy Land
Zip
94561
Railways
Amtrack
Schools
Delta Valley MS
Waterways
Dutch Slough
Township
2-4N
Range
3E
Section
Multi
Other Location Info
Bethal Island

Notice of Determination

Approving Agency
Diablo Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print