Sherwood Road Geometric Upgrades Project

4 Documents in Project

Summary

SCH Number
2014072020
Lead Agency
Caltrans 1 (Eureka) (California Department of Transportation, District 1)
Document Title
Sherwood Road Geometric Upgrades Project
Document Type
NOD - Notice of Determination
Received
Posted
6/2/2015
Present Land Use
Residential/Inland

Document Description
This project involves realigning the existing Sherwood Road intersection with U.S. 101 in Willits from PM 47.1-47.3. The proposed project will re-align Sherwood Road to intersect U.S. 101 perpendicularly, add 8-foot-wide shoulders, include a retaining wall along the west side of the new road, reduce the grade on Sherwood Road to 10%, increase the length of the left and right of turn lanes on Sherwood Road from about 15 feet to 200 feet, and improve the signalized intersection with Americans with Disabilities Act (ADA) compliance. The acquisition of new State right of way will be required (approximately 0.55 acres).

Contact Information
Mike Bartlett
California Department of Transportation, District 1
2379 Gateway Oaks Dr., #150
Sacramento, CA 95833

Phone : (530) 635-3430

Location

Coordinates
39°24'55"N 123°21'17"W
Cities
Willits
Counties
Sacramento
Cross Streets
Sherwood Road/US Highway 101
Parcel #
Various
State Highways
Hwy 20, 101
Railways
UPRR
Schools
Various
Waterways
Various
Township
18N
Range
13W
Section
13

Notice of Determination

Approving Agency
Caltrans
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
Caltrans District 3, Venture Oaks Office, 2379 Gateway Oaks Drive, Suite 150, Sacramento, CA

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search