California State Route 36 Improvement Project
3 Documents in Project
Summary
SCH Number
2014072016
Lead Agency
California Department of Transportation, District 1
Document Title
California State Route 36 Improvement Project
Document Type
NOD - Notice of Determination
Received
Posted
9/15/2014
Present Land Use
Forestry Recreation - Special Building Site (FR-B-5(40)) and (FR-B-5(20)), Timberland Production (TPZ), and Unclassified (U)
Document Description
Caltrans and the Federal Highway Administration (FHWA), Central Federal Lands Highway Division (CFLHD), in cooperation with the U.S. Forest Service, Six Rivers National Forest, is proposing to improve California State Route 36 (SR 36) in southeastern Humboldt County approximately 12.3 miles east of the community of Bridgeville (Humboldt County Mile Post [HUM MP] 36.1 to HUM MP 40.5). Proposed improvements include realigning and widening SR 36 to attain two 12-foot-wide travel lanes with 4-foot-wide paved shoulders. In addition, new signing, pavement delineation, and the acquisition of new right-of-way are included in the project.
Contact Information
Name
Valerie Gizinski
Agency Name
California Department of Transportation, District 1
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Counties
Humboldt
Cross Streets
None; between HUM MP 36.1 to HUM MP 40.5 on SR 36
Zip
95526
Total Acres
131.7
Airports
Dinsmore
Waterways
Van Duzen River, Little Van Duzen River
Township
1N
Range
5E
Section
3/5/7
Other Location Info
Dinsmore and Bridgeville
Notice of Determination
Approving Agency
Caltrans District 1
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.