Vina Robles Winery Conditional Use Permit; DRC2013-00009

2 Documents in Project

Summary

SCH Number
2014071068
Lead Agency
San Luis Obispo County
Document Title
Vina Robles Winery Conditional Use Permit; DRC2013-00009
Document Type
NOD - Notice of Determination
Received
Posted
9/18/2014
Present Land Use
Agriculture

Document Description
Request by Vina Robles Winery for a Conditional Use Permit to allow for the construction of a two-phase wine processing facility. Phase 1 would include a two-story, 80,680 square foot (SF) winery, including; a wine processing facility; administrative space; kitchen area; barrel and case good storage area; lab; press and crush bay; restrooms; locker room; equipment maintenance room; break room; access improvements; water storage/wastewater storage ponds, and parking area. Phase II would include the development of a 21,680 square wine storage area. The proposed winery would produce a maximum of 100,000 cases annually. The project is not proposing any public wine tasting or special events.

Contact Information
Rob Fitzroy
San Luis Obispo County
976 Osos Street, Rm 200
San Luis Obispo, CA 93408-2040

Phone : (805) 781-5600

Location

Coordinates
35°38'9"N 120°38'19"W
Cities
Paso Robles Pismo Beach
Counties
San Luis Obispo
Cross Streets
Southeast portion of the intersection of Priska Road and Union Road
Zip
93447
Total Acres
45.1
Parcel #
026-211-033
State Highways
Hwy 46
Airports
Paso Robles
Schools
Paso Robles Joint USD

Notice of Determination

Approving Agency
San Luis Obispo County Planning Commission
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
County of San Luis Obispo Dept of Planning & Building 976 Osos Street, Rm 200 San Luis Obispo, CA 93408-2040 Website: http://www.sloplanning.org

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print