Addendum to the MND for the University Drive Widening Project

3 Documents in Project

Summary

SCH Number
2014071059
Lead Agency
City of Irvine
Document Title
Addendum to the MND for the University Drive Widening Project
Document Type
NOD - Notice of Determination
Received
Posted
11/25/2015
Present Land Use
GP: Major Highway 6-Lanes
Document Description
The University Drive Widening Project proposes improvements along University Drive between the MacArthur Blvd southbound ramps and Campus Drive. Subsequent to adoption of the MND for the project, minor technical changes were made to include improvements at the University Drive/Campus Drive intersection. These improvements include a second northbound Campus Drive left turn lane and a second eastbound University Drive left turn lane, reconstruction of the curb return on the northeast quadrant of the intersection, and traffic signal modifications. The city determined that no new or substantially increased impacts would occur as a result of these changes.

Contact Information

Name
Katie Berg-Curtis
Agency Name
City of Irvine
Contact Types
Lead/Public Agency

Location

Cities
Irvine
Counties
Orange
Cross Streets
University Drive/MacArthur Blvd, California Avenue, Mesa Road, Campus Drive
Zip
92606
Total Acres
16.3
Parcel #
Numerous
State Highways
SR-73, I-405
Airports
John Wayne
Schools
Numerous
Waterways
San Diego Creek
Township
6S
Range
9W
Section
17/18
Base
SBB&M

Notice of Determination

Approving Agency
City of Irvine
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print