University Drive Widening Project (MacArthur Boulevard to Campus Drive)

3 Documents in Project

Summary

SCH Number
2014071059
Lead Agency
City of Irvine
Document Title
University Drive Widening Project (MacArthur Boulevard to Campus Drive)
Document Type
NOD - Notice of Determination
Received
Posted
11/18/2014
Present Land Use
GP: Major Highway 6-Lanes
Document Description
University Drive is designated "Major Highway 6-Lanes" by the City of Irvine General Plan Circulation Element. According to a traffic analysis conducted for the proposed project, the University Drive segments from MacArthur Boulevard northbound ramps to Campus Drive currently operate at unacceptable levels of service, and will continue to worsen over time without improvements. The proposed project would provide a third travel lane with curb and gutter in each direction and sidewalk on the eastbound side of University Drive from Campus Drive to MacArthur Boulevard. The roadway alignment would not be altered and medians would typically be 14 feet wide to minimize pavement modifications at the medians and impacts to median utilities, lighting, and landscaping. These improvements would address existing deficiencies and complete this segment of University Drive consistent with the City of Irvine General Plan Circulation Element.

Contact Information

Name
Katie Berg-Curtis
Agency Name
City of Irvine
Contact Types
Lead/Public Agency

Location

Cities
Irvine
Counties
Orange
Cross Streets
University Drive/MacArthur Blvd, California Avenue, Mesa Road, Campus Drive
Zip
92606
Total Acres
16.3
Parcel #
Numerous
State Highways
SR-73, I-405
Airports
John Wayne
Schools
Numerous
Waterways
San Diego Creek
Township
6S
Range
9W
Section
17/18
Base
SBB&M

Notice of Determination

Approving Agency
City of Irvine
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print