Great Basin Unfied Air Pollution Control District Rule 433 (Contorl of Particulate Emissions at Owens LAke)
15 Documents in Project
Summary
SCH Number
2014071057
Lead Agency
City of Los Angeles
Document Title
Great Basin Unfied Air Pollution Control District Rule 433 (Contorl of Particulate Emissions at Owens LAke)
Document Type
NOD - Notice of Determination
Received
Posted
4/18/2016
Present Land Use
LU: dust control, open space, recreation
Z: Open Space (OS-40)
GPLU: State and Federal Land (SFL)
Document Description
On April 13, 2016 the Governing Board of the Great Basin Unified Air Pollution Control District (GBUAPCD) adopted and issued (1) District Board Order #160413-01 authorized by CA Health and Safety Code Section 42316 for the City of Los Angeles (City) to install, operate and maintain additional dust control measures on the Owens Lake bed, (2) District Rule 433 (Control of Particulate Emissions at Owens Lake), and (3) the final 2016 revision to the previously-adopted Owens Valley PM10 Planning Area Demonstration of Attainment State Implementation Plan (2016 SIP) collectively "Board of Actions"). The Board Actions include orders and requirements for the City to construct and operate additional dust control measures (DCMs) on the dry Owens Lake bed at the southern end of Owens Valley in Inyo County eastern-central CA.
Contact Information
Name
Phillip L. Kiddoo
Agency Name
Great Basin Unified Air Pollution Control District
Contact Types
Lead/Public Agency
Phone
Location
Counties
Inyo
Cross Streets
Various
Zip
93549
Total Acres
3478
Parcel #
Various
State Highways
Hwy 395, SR 136, 190
Waterways
Owens Dry Lake, Owens River
Base
MDB&M
Other Location Info
Owens Lake
Notice of Determination
Approving Agency
Great Basin Unified Air Pollution Control District
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.