Well 46 (Snow Creek)

2 Documents in Project

Summary

SCH Number
2014071037
Lead Agency
Desert Water Agency
Document Title
Well 46 (Snow Creek)
Document Type
NOD - Notice of Determination
Received
Posted
8/25/2014
Present Land Use
The proposed well will be constructed on DWA's existing 0.92 acre Snow Creek Power Plant site, which is zoned Rural Residential. The general plan designation on the Project site is Open Space
Document Description
The Agency's Well 46 (Snow Creek) project (herein also referred to as the Project) consists of the construction and operation of one domestic groundwater production well and pumping plant on DWA's existing Snow Creek Power Plant property and connection of said well to the Snow Creek Village Reservoir via the existing Snow Creek Penstock. The well is expected to be approximately 14 to 20 inches in diameter and to extend to a depth of up to 1,500 feet below ground surface. The well is anticipated to have a capacity of up to 1,000 gallons per minute (gpm) and to operate up to approximately 90 days per year when the Snow Creek and Falls Creek surface water diversions are out of service. Water resulting from development and testing of the proposed well, and water resulting from periodic well purging during operation, will be discharged to Snow Creek via the existing 20" waste pipeline. The project location is shown on Figures 1 and 2 attached to the Initial Study.

Contact Information

Name
David K. Luker
Agency Name
Desert Water Agency
Contact Types
Lead/Public Agency

Location

Cities
Palm Springs
Counties
Riverside
Cross Streets
Snow Creek Road + Palm Canyon Drive (Hwy 111)
Zip
92282
Total Acres
1
Parcel #
522-100-018
State Highways
Hwy 111, I-10
Railways
No
Airports
No
Schools
No
Waterways
San Gorgonio River, Snow Creek, Falls Creek
Township
3S
Range
3E
Section
21
Base
SBB&M

Notice of Determination

Approving Agency
Desert Water Agency
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print