Carpinteria Avenue Bridge Replacement Project (Streambed Alteration Agreement No. 1600-2016-0274-R5 (SAA))

3 Documents in Project

Summary

SCH Number
2014071007
Lead Agency
City of Carpinteria
Document Title
Carpinteria Avenue Bridge Replacement Project (Streambed Alteration Agreement No. 1600-2016-0274-R5 (SAA))
Document Type
NOD - Notice of Determination
Received
Posted
10/6/2017
Present Land Use
LU: OSR, MDR, GC Z: PRD, CPD
Document Description
CDFW is intending to execute a Streambed Alteration Agreement pursuant to Section 1602 of the Fish and Game Code (#1600-2016-0274-R5) to the project applicant, City of Carpinteria Public Works. The project includes the demolition of the existing Carpinteria Avenue Bridge and in its place, the construction of a new three span bridge supported on pile foundations. The existing bike path will be reconstructed and extended. Rock slope protection will be used to provide scour protection from storm flows and then covered with soil to facilitate habitat restoration. Construction will take place over two seasons. Equipment proposed for use includes dozers, wheeled loaders, back hoes, excavators, pile drilling equipment, cranes, hoe ram, water trucks, dump trucks, roller compactor, paving equipment, air compressor, and a motor-grader.

Contact Information

Name
Sarah Rains
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Cities
Carpinteria
Counties
Santa Barbara
Cross Streets
Carpinteria Avenue at Arbol Verde Street
Zip
93013
Total Acres
4
Parcel #
001-070-055, 001-070-031
State Highways
Hwy 101, 192, 150
Railways
UPRR
Schools
Carpinteria MS
Waterways
Carpinteria Creek, Rincon Creek
Township
4N
Range
25W
Section
28

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print