Master Case #13-196, Conditional Use Permit #13-016

Summary

SCH Number
2014069027
Lead Agency
Santa Clarita, City of (City of Santa Clarita)
Document Title
Master Case #13-196, Conditional Use Permit #13-016
Document Type
NOD - Notice of Determination
Received

Document Description
The applicant is requesting approval of a California Use Permit to allow for the installation of an unmanned wireless telecommunication facility on a .324 acre parcel in the community of Canyon Country within the City of Santa Clarita. The property currently holds a 38' tall Newhall County Water District tank as well as 100' tall T-Mobile wireless monopole and associated equipment located within an equipment enclosure. The new telecommunication facility is proposed to contain the following: 1) A fully enclosed 10' tall, roofed, split-faced CMU block equipment shelter measuring 10'x45' (450 square feet) to house the associated wireless equipment including seven wireless cabinets; 2) Two 44' tall stealth monopoles (36' in diameter), painted to match the existing water tank; and, 3) Two 7' tall RRU equipment racks, one 6'-6" wide and the second 10'-4" wide. All proposed equipment would be located within the existing chain link fencing surrounding the Newhall Water District property. The proposed project complies with the standards set forth within the City's Unified Development Code related to wireless facilities.

Contact Information
Jessica M. Frank
City of Santa Clarita
23920 Valencia Boulevard, Suite 140
Santa Clarita, CA 91355

(661) 255-4330

Location

Cities
Santa Clarita
Counties
Los Angeles

Notice of Determination

Approving Agency
City of Santa Clarita, Planning Commission
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
Department of Community Development, 23920 Valencia Boulevard, Suite 140, Santa Clarita, CA 91355

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
N/A
Download CSV New Search