DC Fast Charging Installation Project

Summary

SCH Number
2014068281
Public Agency
Peralta Community College District
Document Title
DC Fast Charging Installation Project
Document Type
NOE - Notice of Exemption
Received
Posted
6/19/2014
Document Description
Installation of stationary electric vehicle charger and 16kwh lithium ion battery bank at an existing college.

Contact Information

Name
Charles Neal
Agency Name
Peralta Community College District
Contact Types
Lead/Public Agency

Location

Cities
Oakland
Counties
Alameda
Other Location Info
333 E 8th St. Oakland, CA

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
S:15303, 15304, Class 3, 4
Reasons for Exemption
Equipment is small, approximately 4' high and 4' wide. Trenching is only minor with electrical runs being 30 feet to several hundred feet in distance. This project requires cutting asphalt or concrete a few feet in depth (1-3 feet) to run electrical conduit and connect the pedestal chargers to existing power grid.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print