Pacific Rod and Gun Club Upland Soil Remedial Action Project

3 Documents in Project

Summary

SCH Number
2014062081
Lead Agency
City and County of San Francisco
Document Title
Pacific Rod and Gun Club Upland Soil Remedial Action Project
Document Type
NOD - Notice of Determination
Received
Posted
4/27/2015
Present Land Use
Public Use District; Open Space Height and Bulk District
Document Description
The project is limited to remediation contaminated soil at the Pacific Rod and Gun Club (PRGC) as required by the Regional Water Quality Control Board Site Cleanup Requirements Order No. R2-2013-0023. The soil is contaminated from shotgun shells and clay targets used at the PRGC, both of which contain toxic substances including lead and polycycle aromatic hydrocarbons. Remediation will consist of excavation and off-site disposal of contaminated soils in upland areas and along the shoreline of Lake Merced. The project covered under the Lake and Streambed Alteration Agreement Number 1600-2014-0353-R3 CDFW is executing pursuant to Section 1602 Fish and Game Code, is limited to the activities associated with remediation only along the shoreline and in or near freshwater and marsh wetlands.

Contact Information

Name
Suzanne DeLeon
Agency Name
CDFW Bay Delta Region
Contact Types
Lead/Public Agency

Location

Cities
San Francisco
Counties
San Francisco
Cross Streets
Highway 35 (Skyline) and Lake Merced Blvd
Zip
94132
Total Acres
10
Parcel #
7283-004
State Highways
Hwy 35, 1
Schools
Ulloa, Feinstein, Lake
Waterways
Lake Merced, Vista Grande Canal, Pacific Ocean
Township
2S
Range
6W

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print