Pacific Rod and Gun Club Upland Soil Remedial Action Project

3 Documents in Project

Summary

SCH Number
2014062081
Lead Agency
San Francisco, City and County of (City and County of San Francisco)
Document Title
Pacific Rod and Gun Club Upland Soil Remedial Action Project
Document Type
NOD - Notice of Determination
Received

Document Description
The San Francisco Public Utilities Commission (SFPUC) proposes to implement the Pacific Rod and Gun Club Upland Soil Remedial Action Plan, which would clean up soil contamination at the Pacific Rod and Gun Club (PRGC), located at 520 John Muir Drive on the southwest side of Lake Merced in San Francisco, California. Soil contamination is the result of the former use of lead shot and clay targets made with asphaltic materials at the skeet and trap shooting ranges. The SFPUC prepared the PRGC Remedial Action Plan (RAP) in response to a Cleanup Order issued by the California Regional Water Quality Control Board, San Francisco Bay Region (RWQCB). The project consists of excavation and appropriate off-site disposal of up to 46,500 cubic yards of soils containing elevated concentrations of lead and polycyclic aromatic hydrocarbons (PAHs) and backfilling of excavated areas with clean fill material.

Contact Information
Timothy Johnston
San Francisco Planning Department
1650 Mission Street, Suite 400
San Francisco, CA 94103

415-575-9035
Timothy.Johnston@sfgov.org

Location

Coordinates
37°42'58.8"N 122°29'43.7"W
Cities
San Francisco
Counties
San Francisco
Cross Streets
Highway 35 (Skyline) and Lake Merced Blvd
Zip
94132
Total Acres
10
Parcel #
7283-004
State Highways
Hwy 35, 1
Schools
Ulloa, Feinstein, Lake
Waterways
Lake Merced, Vista Grande Canal, Pacific Ocean
Township
2S
Range
6W

Notice of Determination

Approving Agency
San Francsico Public Utilities Commission
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
San Francisco Planning Department, 1650 Mission Street, Suite 400, San Francisco, CA 94103 in file No. 2013.1220E

Determinations

(1) The project will have a significant impact on the environment
N/A
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search