SASD Creek Protection Project Phase II

5 Documents in Project

Summary

SCH Number
2014062049
Lead Agency
Sacramento Area Sewer District
Document Title
SASD Creek Protection Project Phase II
Document Type
NOD - Notice of Determination
Received
Posted
3/6/2015

Document Description
The Sacramento Area Sewer District (SASD) evaluated 41 sewer creek crossings to determine if maintenance is required to prevent accidental sewage discharge into local waterways. All sites were ranked based on accidental discharge potential. Five sites were considered priority and were repaired or rerouted as part of the Creek Protection Project Five Priority Sites construction process. This project analyzes the next set of prioritized creek crossings which will be repaired in 2014 and 2015. These five sites require a variety of maintenance activities and are described in detail below. Common with all site repairs is the hydroseeding of disturbed areas and appropriate erosion control measures within the creek channel.

Contact Information
Linda Peters
Sacramento Area Sewer District
10060 Goethe Road
Sacramento, CA 95827

Phone : (916) 876-6000

Location

Coordinates
38°41'17"N 121°17'52"W
Cities
Citrus Heights
Counties
Sacramento
Cross Streets
Various
Zip
multiple
Parcel #
Various
State Highways
I-80
Schools
San Jaun School District
Waterways
Arcade Creek
Township
10N
Range
6E
Section
26
Base
MDB&M
Other Location Info
Fair Oaks

Notice of Determination

Approving Agency
Sacramento Area Sewer District
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
10060 Goethe Rd, Sacramento, CA 95827

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.