Permit No. 19463: Yuba Goldfields 200-Year Flood Protection project - Supplemental EIR

12 Documents in Project

Summary

SCH Number
2014062045
Lead Agency
Three Rivers Levee Improvement Authority
Document Title
Permit No. 19463: Yuba Goldfields 200-Year Flood Protection project - Supplemental EIR
Document Type
NOD - Notice of Determination
Received
Posted
3/3/2020
Document Description
Approval of Permit No. 19463, under California Code of Regulations, Title 23, Section 6, for work within an adopted plan of flood control, within a Regulated Stream (Table 8.1; Title 23, Div. 1, Article 8): To construct approximately 2.6 miles of new levee including a cutoff wall; seepage berm; access roads and ramps; degrade approximately 1,000 feet of the existing south levee; relocate an irrigation canal; construct a drainage system including culverts and pipes.

Contact Information

Name
James Herota
Agency Name
Central Valley Flood Protection Board
Contact Types
Lead/Public Agency

Name
Agency Name
Three Rivers Levee Improvement Authority
Contact Types
Project Applicant

Location

Counties
Yuba
Other Location Info
At the upstream terminus of the existing Yuba River South Levee

Notice of Determination

Approving Agency
Central Valley Flood Protection Board
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print