Yuba Goldfields 200-Year Flood Protection Project -Addendum No. 2 to Environmental Impact Report
12 Documents in Project
Summary
SCH Number
2014062045
Lead Agency
Three Rivers Levee Improvement Authority
Document Title
Yuba Goldfields 200-Year Flood Protection Project -Addendum No. 2 to Environmental Impact Report
Document Type
NOD - Notice of Determination
Received
Posted
1/23/2020
Document Description
To reduce the flood risk to properties within the Reclamation District 784 service area, TRLIA proposes to construct a 2.6-mile-long levee south of the Yuba Goldfields using standard levee material to intercept flood flows from the Yuba River via the Goldfields, and redirect them to the Yuba River floodplain west of the Yuba Goldfields. The levee will be designed to meet U.S. Army Corps of Engineers and California Department of Water Resources urban levee design criteria for 200-year flood risk reduction. A levee with seepage remediation, patrol roads, and access ramps, would be constructed. Construction would take approximately 8 months and is anticipated to occur in 2020.
Contact Information
Name
Paul Brunner
Agency Name
Three Rivers Levee Improvement Authority (TRLIA)
Contact Types
Lead/Public Agency
Phone
Name
Agency Name
Three Rivers Levee Improvement Authority (TRLIA)
Contact Types
Project Applicant
Location
Counties
Yuba
Cross Streets
Hammonton-Smartville Road
Notice of Determination
Approving Agency
Three Rivers Levee Improvement Authority (TRLIA)
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.