Yuba Goldfields 200-Year Flood Protection Project -Addendum No. 3 to Environmental Impact Report

12 Documents in Project

Summary

SCH Number
2014062045
Lead Agency
Three Rivers Levee Improvement Authority
Document Title
Yuba Goldfields 200-Year Flood Protection Project -Addendum No. 3 to Environmental Impact Report
Document Type
NOD - Notice of Determination
Received
Posted
7/24/2020
Document Description
To reduce the flood risk in the Reclamation District 784 service area, TRLIA is constructing a 2.6-mile-long levee south of the Yuba Goldfields to intercept flood flows from the Yuba River via the Goldfields, and redirect them to the Yuba River floodplain west of the Yuba Goldfields. The levee was designed to meet U.S. Army Corps of Engineers and California Department of Water Resources urban levee design criteria for 200-year flood risk reduction. A levee with seepage remediation, patrol roads, and access ramps is being constructed, and two areas in the Goldfields are being modified. Construction will primarily occur in 2020, with some components extending into 2021.

Contact Information

Name
Paul Brunner
Agency Name
Three Rivers Levee Improvement Authority
Contact Types
Lead/Public Agency

Name
Agency Name
Three Rivers Levee Improvement Authority
Contact Types
Project Applicant

Location

Counties
Yuba
Cross Streets
lmmediately north of Hammonton-Smartville Road

Notice of Determination

Approving Agency
Three Rivers Levee Improvement Authority
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print