Neary Lagoon Vegetation Management and Sediment Removal Project

2 Documents in Project

Summary

SCH Number
2014062028
Lead Agency
Santa Cruz, City of (City of Santa Cruz)
Document Title
Neary Lagoon Vegetation Management and Sediment Removal Project
Document Type
NOD - Notice of Determination
Received
Posted
3/16/2015
Present Land Use
Public Facility/Park

Document Description
The project consists of periodically scheduled and implemented maintenance activities that are necessary to maintain pedestrian access areas, the functional width and depth of primary lagoon channels above the concrete weir and maintenance of the outflow channel upstream of the Neary Lagoon Pump Station. Maintenance activities include, but are not necessarily limited to the following: activities such as sediment removal or vegetation control to correct conditions that threaten or degrade natural environments (such as non-native plant species control, removal of trash from channels or drainage and erosion repairs, and habitat enhancement). The California Department of Fish and Wildlife is executing a Lake and Streambed Alteration Agreement Number 1600-2014-0251 pursuant to Section 1602 of the Fish and Game Code to the project Applicant, Mark Dettle/City of Santa Cruz Department of Public Works.

Contact Information
Melissa Farinha
CDFW Bay Delta Region
7329 Silverado Trail
Napa, CA 94558

Phone : (707) 944-5579

Location

Cities
Santa Cruz
Counties
Santa Cruz
Cross Streets
California St. and Bay Avenue
Total Acres
44
State Highways
Hwy 1, 17
Railways
UPRR
Waterways
No

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
809 Center Street, Santa Cruz, CA 95060 Suzanne Healy, 831-420-5131

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print