Sutter Maintenance Yard Expansion Project
2 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2014062005
- Lead Agency
- Water Resources, Department of (California Department of Water Resources)
- Document Title
- Sutter Maintenance Yard Expansion Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 7/14/2014
- Present Land Use
- General Agricultural District/Agriculture, 80-acre minimum
- Document Description
- DWR's Division of Flood Management proposes to expand the existing Sutter Maintenance Yard (SMY) facility by 9.8 acres (in a location adjacent to the SMY) for storage of equipment and materials needed for flood maintenance and emergency response. An immature walnut orchard on the project site would be uprooted and chipped into mulch on-site.
- Contact Information
-
Shelly Amrhein
California Department of Water Resources
3310 El Camino Avenue, Suite 140
Sacramento, CA 95821
Phone : (916) 574-2884
Location
- Coordinates
- 39°8'30.97"N 121°44'40.22"W
- Counties
- Sutter
- Cross Streets
- Colusa Highway (Hwy 20)
- Zip
- 95982
- Total Acres
- 9.8
- Parcel #
- 13270108
- State Highways
- Hwy 20
- Waterways
- Wadsworth Canal
- Township
- 15N
- Range
- 2E
- Section
- 21
- Base
- MDB&M
- Other Location Info
- Sutter
Notice of Determination
- Approving Agency
- CA Department of Water Resources
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- Sutter County Clerk of the Board of Supervisors, Yuba City, CA; DWR Website; and DWR 3310 El Camino Ave., Room 140, Sacramento, CA 95821
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.