Hayford Flume #2 Replacement Project

2 Documents in Project

Summary

SCH Number
2014062003
Lead Agency
Placer County Water Agency
Document Title
Hayford Flume #2 Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
7/18/2014
Present Land Use
F-B 100 (Farm-Building, 100,000 sf minimum) / Ranchette, 2.5- to 20-acre minimum
Document Description
The proposed project involves replacing the existing, elevated Hayford Flume #2 on the Boardman Canal system. The existing 175-foot-long flume would be removed and a new 435-foot-long conveyance pipeline system installed to provide a conveyance for the Boardman Canal flows. The proposed project also includes construction of a new 175-foot-long access road to facilitate access to the work area and provide better access for future maintenance activities. The pipeline will be installed in an engineered bench to traverse the nearby hillside. Hayford Flume #2 would be demolished and removed after the new conveyance system is operational.

Contact Information

Name
Heather Trejo
Agency Name
Placer County Water Agency
Contact Types
Lead/Public Agency

Location

Cities
Colfax
Counties
Placer
Cross Streets
Placer Hills Road
Total Acres
1
Parcel #
071-111-067 and 071-111-057
State Highways
Hwy 80
Railways
UPRR
Airports
No
Schools
No
Waterways
Bear River
Township
14N
Range
9E
Section
16

Notice of Determination

Approving Agency
Placer County Water Agency
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.