King Basin Water Retention (Streambed Alteration Agreement No. 1600-2015-0001-R4)

4 Documents in Project

Summary

SCH Number
2014061061
Lead Agency
Kaweah Delta Water Conservation District
Document Title
King Basin Water Retention (Streambed Alteration Agreement No. 1600-2015-0001-R4)
Document Type
NOD - Notice of Determination
Received

Document Description
CDFW has executed streambed alteration agreement no 1600-2015-0001-R4, pursuant to section 1602 of the fish and game code to the project applicant, Kaweah Delta Water Conservation District. The project includes activities related to the construction of a within-channel basin to widen the channel cross section and reduce peak flows, and an in-channel concrete Replogle flume to measure flows moving downstream of the basin. The Agreement term is extended to November 12, 2021, and a protective measures of the Agreement were updated to require curveys and reporting each year of project activity.

Contact Information
Carrie Swanberg
CDFW
1234 East Shaw Avenue
Fresno, CA 93710

559-243-4014 x246

Location

Coordinates
36°20'32"N 119°8'59"W
Cities
Exeter
Counties
Tulare
Cross Streets
Road 196 and Lort Drive
Zip
93292
Total Acres
23.9
Parcel #
111-080-065
State Highways
Hwy 65, 198, and 245
Railways
SJVRR
Waterways
Johnson Slough
Township
18
Range
26
Section
22
Base
MDB&M

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
2975 Farmersville Blvd., Farmersville, CA 93223

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search