Salt Creek Regional Sewer Project - 1627' Pressure Zone, 1719' PZ Phase I Water Infrastructure and Recycled Water Pipelines
3 Documents in Project
Summary
SCH Number
2014061045
Lead Agency
Eastern Municipal Water District
(EMWD)
Document Title
Salt Creek Regional Sewer Project - 1627' Pressure Zone, 1719' PZ Phase I Water Infrastructure and Recycled Water Pipelines
Document Type
NOD - Notice of Determination
Received
Posted
8/13/2014
Document Description
Eastern Municipal Water District (District) proposes to construct and operate a new sewer located directly south of Salt Creek along the Riverside County Flood Control maintenance road. The purpose of the project is to build the infrastructure necessary to support approved land uses in and around the Winchester Hills Specific Plan (No. 293). See Figure 3 - Proposed Facilities.
The new sewer includes the installation of approximately 10,300 linear feet of pipeline ranging from 15-inch diameter to 21-inch diameter. The project would be constructed at a depth of approximately 15 feet, within existing rights-of-way and along the Riverside County Flood Control maintenance road.
The proposed project also considers the construction of approximately 8,700 linear feet of 18-inch diameter water pipeline to server the 1627 pressure zone; approximately 10,200 linear feet of water pipeline ranging from 18-inch diameter to 36-inch diameter to serve the 1719 pressure zone; and approximately 23,000 linear feet of 18-inch recycled water pipeline to be installed along Olive Avenue and Domenigoni Parkway.
Contact Information
Name
Helen Stratton
Agency Name
Eastern Municipal Water District
Contact Types
Lead/Public Agency
Phone
Location
Counties
Riverside
Cross Streets
RCFC Maintenance Road between La Ventana Road and Rice Road
Zip
92596
State Highways
Hwy 79
Schools
Winchester
Waterways
Salt Creek
Township
5S
Range
2W
Section
28-30
Base
SBB&M
Other Location Info
Winchester
Notice of Determination
Approving Agency
Eastern Municipal Water District
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No