Operation of City of Anaheim (City) - Well 59 Project (Project)

3 Documents in Project

Summary

SCH Number
2014061006
Lead Agency
City of Anaheim
Document Title
Operation of City of Anaheim (City) - Well 59 Project (Project)
Document Type
NOD - Notice of Determination
Received
Posted
1/28/2019
Present Land Use
Older Water Production Well/Transitional/Public-Institutional
Document Description
The City proposed Project included a replacement of an inactive water production well (Well 36) with a new high production water well (Well 59) that will have a horsepower of 350-400 horsepower, a pumping capacity of 2000-3000 gallons per minute, and an approx. depth of 1400 feet. The new well will be located approx. 42 feet NE of the existing well and it will be enclosed within a roll-away enclosure. The project also includes the construction of a new block wall building for storage of two hypochlorite tanks and an ammonia tank (if needed, in the future). Up to six ornamental trees will be removed but will be replaced in kind following construction. Will 36 will be destroyed per State and local regulations.

Contact Information

Name
Marie Newland
Agency Name
City of Anaheim
Contact Types
Lead/Public Agency

Location

Cities
Anaheim
Counties
Orange
Cross Streets
Ninth Street & Cerritos Avenue
Zip
92802
Total Acres
.27
Parcel #
129-452-31
State Highways
SR 5
Railways
SPRR
Airports
No
Schools
Palm Lane, Ball Jr High
Waterways
Anaheim Barber Flood Channel
Township
4S
Range
10W
Section
21
Other Location Info
1607 S. Ninth Street, Anaheim, Santa Ana County

Notice of Determination

Approving Agency
SWRCB
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print