Well 59

3 Documents in Project

Summary

SCH Number
2014061006
Lead Agency
Anaheim, City of (City of Anaheim)
Document Title
Well 59
Document Type
NOD - Notice of Determination
Received

Document Description
Replacement of an inactive water production well (Well 36) with a new high production water well, Well 59, that will have a horsepower of 350-400 hp, a pumping capacity of 2,000-3,000 gallons per minute, and an approximate depth of 1,400 feet. The new well will be located approximately 42 feet northeast of the existing well and it will be enclosed within a roll-away enclosure. Project also includes the construction of a new block wall building for storage of two chlorine tanks and an ammonia tank (if needed, in the future). Up to six ornamental trees will be removed, but will be replaced in kind following construction. Well 36 will be destroyed per State and local regulations.

Contact Information
Marie Newland
City of Anaheim
201 S. Anaheim Boulevard, Suite 601
Anaheim, CA 92805

714-765-4166

Location

Coordinates
33°48'27.3"N 117°56'.35"W
Cities
Anaheim
Counties
Orange
Cross Streets
Ninth Street & Cerritos Avenue
Zip
92802
Total Acres
.27
Parcel #
129-452-31
State Highways
SR 5
Railways
SPRR
Airports
No
Schools
Palm Lane, Ball Jr High
Waterways
Anaheim Barber Flood Channel
Township
4S
Range
10W
Section
21

Notice of Determination

Approving Agency
City of Anaheim City Council
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
City of Anaheim Public Utilities Department, Environmental Services Division, 201 S. Anaheim Boulevard, Suite 601, Anaheim, CA 92805

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
N/A
Download CSV New Search