Water Meter Installation Project - Phase 2
2 Documents in Project
Summary
SCH Number
2014058331
Public Agency
South Tahoe Public Utility District
Document Title
Water Meter Installation Project - Phase 2
Document Type
NOE - Notice of Exemption
Received
Posted
7/5/2016
Document Description
SWRCB's (responsible agency) Safe Drinking Water State Revolving Fund program is providing funds for the project. The South Tahoe Public Facility District proposes to implement Phase II of the Water Meter Installation project for 1,421 residential and commercial water meters on existing service connections as required by State Law AB2572. Beneficiaries are District ratepayers.
With regards to locations and feasibility of the project, the water meters will be installed in previously disturbed areas along previously installed infrastructure piping.
Contact Information
Name
Lynn Nolan
Agency Name
SWRCB
Contact Types
Lead/Public Agency
Phone
Location
Cities
South Lake Tahoe
Counties
El Dorado
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
15301
Reasons for Exemption
Nepa-like exclusion status: Minor upgrades to existing facilities.
The project activities consist of minor alterations to existing public utility service facilities which do not include any of the exceptions pursuant to 15301.
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.