Rutland Production Well and Pumping Station

2 Documents in Project

Summary

SCH Number
2014052095
Lead Agency
Sacramento Suburban Water District
Document Title
Rutland Production Well and Pumping Station
Document Type
NOD - Notice of Determination
Received
Posted
7/24/2014
Present Land Use
Single Family Residential (RD5) / Low-Density Residential (LDR)
Document Description
The Sacramento Suburban Water District proposes to construct and operate one well to supplement existing supplies in the northern portion of its service area, within unincorporated Sacramento County. The Rutland Well site would consist of an 18-inch groundwater well capable of producing approximately 1,600 gallons per minute (gpm). The well would include new connection to both the Sacramento County-owned storm drain and sanitary sewer. An approximately 700 sf building would be constructed to house the motor control center, treatment equipment, and chlorination facilities for disinfection of the treated water. If necessary an iron/manganese treatment system would be constructed.

Contact Information

Name
John Valdes
Agency Name
Sacramento Suburban Water District
Contact Types
Lead/Public Agency

Location

Counties
Sacramento
Cross Streets
McKinney Way and Rutland Drive
Zip
95608
Total Acres
.25
Parcel #
236-0012-001
State Highways
Hwy 50
Schools
Charles Peck ES
Township
9N
Range
6E
Section
4
Other Location Info
Carmichael

Notice of Determination

Approving Agency
Sacramento Suburban Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print