Marine Express Site Improvements
3 Documents in Project
Summary
SCH Number
2014052093
Lead Agency
City of Pittsburg
Document Title
Marine Express Site Improvements
Document Type
NOD - Notice of Determination
Received
Posted
12/24/2014
Present Land Use
Industrial / IG
Document Description
The project proponent request approval from the City of Pittsburg (city) for site improvements to a 2.86 acre parcel currently being used as a small scale contractor yard. The project will also involve the storage and handling of hazardous materials. Proposed site improvements include concrete slabs for two prefabricated metal buildings, as well as landscaping, two paved driveways, a 168 sf guardhouse, an eight-foot tall masonry wall, a 12-stall parking lot, a gravel storage area, a concrete pad, the creation of a 60-foot by 80-foot slipway, and the creation of a 40-foot by 80-foot inlet slip for the moorage of marine vessels. The improvements would facilitate the use of the property as a contractor yard supporting Marine Express' upriver marine operations, and the storage and repair of Marine Express' fleet and equipment. The property is located in the IG (General Industrial) District of the city.
Contact Information
Name
Alexandra Endress
Agency Name
City of Pittsburg
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Pittsburg
Counties
Contra Costa
Cross Streets
695 East Third Street at Harbor Street
Zip
94565
Total Acres
2.86
Parcel #
088-152-017
State Highways
Hwy 4
Railways
UPRR, BNSF
Airports
No
Schools
Marina Vista
Waterways
Suisun Bay
Township
2N
Range
1
Section
13
Base
MDB&M
Notice of Determination
Approving Agency
City of Pittsburg
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.