Industrial Avenue Bridge Replacement Project

4 Documents in Project

Summary

SCH Number
2014052091
Lead Agency
City of Roseville
Document Title
Industrial Avenue Bridge Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
8/27/2014
Present Land Use
LU: M2 and M1 (Industrial), P/QP; Z: IND and LI, P/QP
Document Description
The City of Roseville (City) is proposing to replace the Industrial Avenue Bridge over Pleasant Grove Creek and reconstruct Industrial Avenue to conform the new bridge. The project proposes to replace the narrow bridge to accommodate a standard width involving two travel lanes with shoulders and a sidewalk on the east side. The new bridge and roadway profile would be elevated to provide the necessary freeboard over the 50-year flood event water surface elevation for Pleasant Grove Creek. The dimensions of the new bridge would be up to 126 feet long and up to 60 feet wide (one 1.5-foot rail, one 1-foot rail, one 5-foot sidewalk, two 8-foot shoulders/bike lanes, two 12-foot travel lanes, and one 12-foot center median/divide).

Contact Information

Name
Audrey Byrnes
Agency Name
City of Roseville
Contact Types
Lead/Public Agency

Location

Cities
Roseville
Counties
Placer
Cross Streets
Blue Oaks Blvd
Zip
95747
Parcel #
City right-of-way
State Highways
Hwy 65
Railways
SPRR
Schools
Rahkala ES
Waterways
Pleasant Grove Creek
Township
11N
Range
6E
Section
16
Base
MDB&M

Notice of Determination

Approving Agency
Roseville City Council
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print