Waste Discharge Requirements for Timber Harvesting and Related Land Management Activities Conducted by H
2 Documents in Project
Summary
SCH Number
2014052073
Lead Agency
Regional Water Quality Control Board, Region 1 (North Coast), Santa Rosa
Document Title
Waste Discharge Requirements for Timber Harvesting and Related Land Management Activities Conducted by H
Document Type
NOD - Notice of Determination
Received
Posted
8/19/2014
Present Land Use
Timber Production
Document Description
This project consists of development of Waste Discharge Requirements (WDRs) for discharges, or threatened discharges, of wastes (e.g. earthen materials such as soil, sand, clay, and rock), organic materials (e.g. slash, sawdust, bark, nutrients, and manure), and temporary loss of shade resulting from timber harvesting and related land management activities on lands owned by HRC in Jordan Creek, a tributary stream to the lower Eel River in Humboldt County, CA. Activities covered by the WDRs include timber harvesting, road use, maintenance, construction, reconstruction, decommissioning, erosion control activities, stream restoration, and water quality monitoring.
Contact Information
Name
Maggie Robinson
Agency Name
Regional Water Quality Control Board, Region 1 (North Coast), Sa
Contact Types
Lead/Public Agency
Phone
Location
Counties
Humboldt
Cross Streets
State Highway 101
State Highways
Hwy 101
Waterways
Lower Eel River
Other Location Info
Pepperwood
Notice of Determination
Approving Agency
North Coast Regional Water Quality Control Board
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.