Line 101 In-Line Inspection Update and Lomita Park Regulator Station Rebuild Project
3 Documents in Project
Summary
SCH Number
2014052068
Lead Agency
City and County of San Francisco
Document Title
Line 101 In-Line Inspection Update and Lomita Park Regulator Station Rebuild Project
Document Type
NOD - Notice of Determination
Received
Posted
9/9/2014
Present Land Use
Airport Land Use / Z: M-2 / GP: Airport
Document Description
The project is limited to replacing a section of the existing Line 101 gas pipeline and upgrading the Lomita Park Regulator Station (station) equipment that regulates pressure along the pipeline. The new pipeline segment shall be approximately 3,200-foot long. The pipeline shall be installed using horizontal directional drilling (HDD). Approximately 0.02 acres of arroyo willow (Salix lasiolepis) will be removed to facilitate an above ground tracking wire for the HDD drilling process.
The HDD will occur at a depth ranging from approximately 40 to 60 feet beneath jurisdictional water features. The station will be expanded by a total of approximately 3,750 square feet. Prior to construction at the station, a temporary exclusion fence will be installed around the existing station. The exclustion fence will encompass an approximately 119,300-square foot area. The area will be used for storing spoils, staging construction equipment and two excavations pits for sniff holes.
Installing 24-inch diameter pipe using HDD methodology will cross under seasonal wetlands and the South Lomita Canal Establishing the temporary work areas around the pipeline tie-in will impact seasonal wetland, and removing approximately 0.02 acres of arroyo willow (Salix laiolepis) for HDD tracking wire access will also impact water bodies.
The California Department of Fish and Wildlife is executing a Lake and Streambed Alteration Agreement Number 1600-2013-0087-3 pursuant to Section 1602 of the Fish and Game Code to the project Applicant, Robert Stiving, Pacific Gas and Electric Company.
Contact Information
Name
Serge Glushkoff
Agency Name
CDFW Bay Delta Region
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Millbrae, San Bruno
Counties
San Mateo
Cross Streets
Monterey St / Madrone St
Zip
94030
Total Acres
17.22
Parcel #
092-030-010
State Highways
Hwy 101
Railways
BART
Airports
San Francisco Int'l
Schools
Various
Waterways
Cupid Row Canal, South Lomita Canal, Highline Canal
Township
4S
Range
5W
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A