East Zayante Road Storm Damage Repair Project (PM 6.22)

3 Documents in Project

Summary

SCH Number
2014052045
Lead Agency
Santa Cruz County
Document Title
East Zayante Road Storm Damage Repair Project (PM 6.22)
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
public right-of-way
Document Description
The County of Santa Cruz Department of Public Works is proposing to excavate and replace 20 cubic yards of roadway, repair the damaged headwall and replace the 48-inch corrugated steel pipe with a 53-foot long corrugated metal arch culvert with precast footings, concrete headwalls at the inlet and outlet. Approximately 20 cubic yards of material would be graded to install a new road bed and associated headwalls and rock slope protection at the upstream and downstream edges of the culvert. Approximately 100 feet of Tanaka Creek would be dewatered to remove and replace the culvert.

Contact Information

Name
Todd Sexauer
Agency Name
Santa Cruz County
Contact Types
Lead/Public Agency

Location

Counties
Santa Cruz
Cross Streets
Graham Hill Road and Hwy 9
Zip
95018
Total Acres
.1
Parcel #
right-of-way
State Highways
Hwy 17
Railways
No
Airports
No
Schools
No
Waterways
unnamed
Township
9S
Range
1W
Section
30
Base
MDB&M
Other Location Info
Felton

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Fish and Wildlife, Bay Delta Region 3 (CDFW), California Department of Parks and Recreation, California Department of Public Health (CDPH), California Department of Transportation, District 4 (DOT), California Highway Patrol, California Native American Heritage Commission (NAHC), California Regional Water Quality Control Board, Central Coast Region 3 (RWQCB), Department of Water Resources, Resources Agency, Resources, Recycling and Recovery, State Water Resources Control Board, Divison of Financial Assistance
Development Types
Transportation:Other (Headwall and Culvert Replacement)
Local Actions
Riparian Exc.
Project Issues
Biological Resources, Cultural Resources, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Vegetation, Wetland/Riparian, Wildlife

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print