California American Water Slant Test Wall Project

2 Documents in Project

Summary

SCH Number
2014051060
Lead Agency
Marina, City of (City of Marina)
Document Title
California American Water Slant Test Wall Project
Document Type
NOD - Notice of Determination
Received
Posted
12/18/2014
Present Land Use
sand mining/Coastal Conservation & Development District w/CDP Combining Dist. overlay/Habitat Reserve, other open space

Document Description
California American Water (CalAm) proposes to construct, operate, and decommission subject to a lease termination and abandonment agreement to be considered at a future Commission meeting, a temporary test slant well including vertical monitoring wells and related infrastructure. The test wellhead vault will be located approximately 650 feet from the existing shoreline and outside the Commission's jurisdiction. The test well will extend from the wellhead vault approximately 1,000 feet into Monterey Bay, beneath the seafloor. The State Lands Commission action is an approval of a 3-year General Lease - Right-of-Way Use through December 16, 2017.

Contact Information
Jennifer Lucchesi
California State Lands Commission
100 Howe Avenue, Suite 100-South
Sacramento, CA 95828-8202

Phone : (916) 574-1800
Fax : (916) 574-1810

Location

Coordinates
36°42'47"N 121°48'20"W
Cities
Marina
Counties
Monterey
Cross Streets
SR 1 and Lapis Road
Zip
93933
Total Acres
5.26
Parcel #
203-011-019-000
State Highways
SR 1
Railways
SPRR, Lapis
Schools
Ione Olson ES
Waterways
Pacific Ocean, Salinas River
Township
14S
Range
1E
Section
13
Base
MDB&M

Notice of Determination

Approving Agency
California State Lands Commission
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
California State Lands Commission 100 Howe Avenue, Suite 100-South Sacramento, CA 95825-8202

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search