Rio Viejo Project

2 Documents in Project

Summary

SCH Number
2014051056
Lead Agency
Division of Oil, Gas, and Geothermal Resources (California Division of Oil, Gas, and Geothermal Resources)
Document Title
Rio Viejo Project
Document Type
NOD - Notice of Determination
Received
Posted
7/2/2014
Present Land Use
Agriculture and oil and gas / A / 8.1 Intensive Agriculture

Document Description
Century Exploration Resources, LLC (Century) is proposing the Rio Viejo Project to construction two (2) drill sites (8.47 acres) and drill a total of six (6) oil wells on these sites. The surface location owners for the proposed site are: Sun Grove Farms LLC for proposed well site S-2 SL and P&N LP for proposed well site S-28 SL. Both locations are approximately 11 miles from Mettler and 60 miles south and west of Bakersfield in Kern County, CA.

Contact Information
Teresa Fung
California Division of Oil, Gas, and Geothermal Resources
801 K Street, MS 18-05
Sacramento, CA 95814-3530

Phone : (916) 324-9017

Location

Cities
Bakersfield
Counties
Kern
Cross Streets
Old River Road / Hwy 166
Total Acres
8.47
Parcel #
a
State Highways
Hwy 166
Railways
No
Airports
No
Schools
No
Waterways
No
Township
11/12N
Range
21W
Section
2/28
Base
SBB&M

Notice of Determination

Approving Agency
Division of Oil, Gas & Geothermal Resources
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
801 K Street, Suite 1805, Sacramento, CA 95814

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print