Construction and Operation of a Connection from a Ground Water Well to a Nitrate Removal Plant and Operation of the Groundwater Well

3 Documents in Project

Summary

SCH Number
2014051054
Lead Agency
Crescenta Valley Water District (CVWD)
Document Title
Construction and Operation of a Connection from a Ground Water Well to a Nitrate Removal Plant and Operation of the Groundwater Well
Document Type
NOD - Notice of Determination
Received
Posted
3/3/2016
Present Land Use
LU: R-3050 Z: R-3050 GP: R-3050
Document Description
SWRCB will be issuing a water supply permit. The Crescenta Valley Water District proposed project includes operating a 350 ft deep 400 gallon/minute groundwater well that was drilled in 2011 and constructing and operating 1,200 lf of 8 in water main that will connect the well to a nitrate removal plant. The connection will provide for the treatment of water that exceeds the MCL for nitrate. The project will also include the construction and operation of a vertical turbine pump and motor, a small building enclosure, above and underground ground discharge piping and flow turbine pump and motor, a small building enclosure, above and underground discharge piping and flow meter, electrical and telemetry systems to control the pump, concrete paving, fencing, and emergency lighting.

Contact Information

Name
Chi Diep
Agency Name
SWRCB
Contact Types
Lead/Public Agency

Location

Cities
Glendale
Counties
Los Angeles
Cross Streets
La Crescenta and Hermosa Ave. & La Crescenta Ave and Sycamore Ave
Zip
91214
Total Acres
.25
Parcel #
5610024905
State Highways
Hwy 210
Other Location Info
La Crescenta

Notice of Determination

Approving Agency
SWRCB
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print