Southern California West of Devers Upgrade Project

14 Documents in Project

Summary

SCH Number
2014051041
Lead Agency
California Public Utilities Commission (CPUC)
Document Title
Southern California West of Devers Upgrade Project
Document Type
NOD - Notice of Determination
Received
Posted
9/4/2018
Present Land Use
numerous
Document Description
Southern California Edison is performing transmission line upgrades over 48 corridor miles of existing 220 kV transmission lines as part of its West of Devers Upgrade Project. The Project will also involve removing existing 220kV electric transmission lines, and replacing them with new double-circuit transmission lines of the same voltages. In order to safety access and construct part of the project, SCE needs temporary easement access to four District-owned parcels located in an unincorporated area of Riverside County near San Timoteo Canyon, identified as Assessor's Parcel numbers 413-140-008, 413-170-004, 413-170-014, and 413-180-010. SCE plans to replace twelve existing electric transmission structures and install one additional electric transmission structure located on the Property. The proposed project consists of entering into a Purchase and Sale agreement for Acquisition of Easements between District and SCE and having the District execute a Grant of temporary Construction easement. The agreement and Grant are necessary to formalize the terms and conditions by which SCE will be allowed to construct the project on the property.

Contact Information

Name
Scott Bangle
Agency Name
Riverside County Park and Open Space District
Contact Types
Lead/Public Agency

Location

Cities
Beaumont, Beaumont, Calimesa, Colton, Grand Terrace, Loma Linda, ..., Calimesa, Colton, Grand Terrace, Loma Linda, Palm Desert, Rancho Cucamonga, Redlands, San Bernardino, Yucaipa
Counties
Riverside, San Bernardino
Cross Streets
I-10 and I-215
State Highways
Hwy 60, 62, 79, 243
Airports
Banning
Waterways
Whitewater, San Timoteo

Notice of Determination

Approving Agency
Riverside County
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print