West of Devers Upgrade Project (Streambed Alteration Agreement NO. 1600-2017-0064-R6 [Revision 2])

14 Documents in Project

Summary

SCH Number
2014051041
Lead Agency
California Public Utilities Commission (CPUC)
Document Title
West of Devers Upgrade Project (Streambed Alteration Agreement NO. 1600-2017-0064-R6 [Revision 2])
Document Type
NOD - Notice of Determination
Received
Posted
4/12/2018
Present Land Use
numerous
Document Description
CDFW has executed Streambed Alteration Agreement No. 1600-2017-0064-R6 (Revision 2), pursuant to section 1602 of the Fish and Game Code to the project applicant, Southern California Edison. The project includes upgrades to the existing West of Devers transmission line between Devers, El Casco, Vista, and San Bernardino Substations to increase electric power transmission capacity. The project will replace existing 220- kilovolt (kV) transmission lines and associated structures with new, higher-capacity 220 kV transmission lines and structures; modify existing substation facilities; remove and replace existing subtransmission (66 kV) lines; remove and replace existing distribution (12 kV) lines; and make various telecommunication system and access road improvements.

Contact Information

Name
Kimberly Freebum-Marquez
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Cities
Beaumont, Beaumont, Calimesa, Colton, Grand Terrace, Loma Linda, ..., Calimesa, Colton, Grand Terrace, Loma Linda, Palm Desert, Rancho Cucamonga, Redlands, San Bernardino, Yucaipa
Counties
Riverside, San Bernardino
Cross Streets
I-10 and I-215
State Highways
Hwy 60, 62, 79, 243
Airports
Banning
Waterways
Whitewater, San Timoteo

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print