(Fresno County, California)

3 Documents in Project

Summary

SCH Number
2014051035
Lead Agency
Fresno Irrigation District
Document Title
(Fresno County, California)
Document Type
NOD - Notice of Determination
Received
Posted
6/23/2014
Present Land Use
Designated flood/irrigation channels/waterways (2 channels)
Document Description
The proposed project is routine channel maintenance for flood control and water conveyance along portions of Big Dry Creek and Fancher Canal in the urban and rural areas of Clovis and Fresno. The Big Dry Creek maintenance reach starts at the Enterprise Canal near Shepherd Avenue and continues downstream to Highway 168 for a distance of approximately 3.25 miles. The Fancher Canal maintenance reach starts at the Fresno Metropolitan Flood Control District's basins near Highland Avenue and continues downstream to Clovis Avenue for a distance of approximately 5 miles. Activities inculde the removal of living and dead vegetation, sediment, and debris from inside the channel and along the banks, construction and maintenance of dirt access roads along channels, repairs to areas with bank erosion, the application of herbicides and rodenticides to control vegetation and rodents inside and along the banks, and repairs and maintenance to existing flow control structures. This work involves the use of hand-crews, power tools, heavy equipment such as excavators, front-end loaders, backhoes, haul trucks, dozers, pump trucks, and herbicide and rodenticide application equipment. The District will obtain a Streambed Alteratioin Agreement from the Calif. Department of Fish and Wildlife for this work.

Contact Information

Name
Laurence Kimura
Agency Name
Fresno Irrigation District
Contact Types
Lead/Public Agency

Location

Cities
Clovis, Fresno
Counties
Fresno
State Highways
Hwy 168 and 180
Airports
Yosemite Int'l
Schools
Few
Waterways
Big Dry Creek, Fancher Canal

Notice of Determination

Approving Agency
Fresno Irrigation District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print