Orange Center School District Water Consolidation Project

4 Documents in Project

Summary

SCH Number
2014051033
Lead Agency
Fresno, City of (City of Fresno)
Document Title
Orange Center School District Water Consolidation Project
Document Type
NOD - Notice of Determination
Received
Posted
11/24/2015
Present Land Use
Roads right-of-way

Document Description
SWRCB is a responsible agency for this project. The SWRCB's Safe Drinking Water State Revolving Fund Program is providing funds for the project. The City of Fresno proposes to install pipeline in the southerly portion of the Fresno metropolitan area for the purpose of connecting the Orange Center School to the City of Fresno utility system to provide the school with reliable potable water supply that meets safe drinking water regulations. The school's existing on-site well will be retained for on-site landscape irrigation. Water connection work and installation of hydrants will occur along these rights of way within the City's Water utility service area.

Contact Information
Carol E. Atkins
SWRCB Division of Financial Assistance
1001 I Street, 17th Floor
Sacramento, CA 95814

Phone : (916) 341-5460

Location

Coordinates
36°41'13"N 36°40'40"W
Cities
Fresno
Counties
Fresno
Cross Streets
South Cherry Avenue / East Central Aveneue / South East Avenue
Zip
93706
Parcel #
329-130-03T
State Highways
SR 99, 41
Railways
No
Airports
No
Schools
W Fresno
Waterways
No
Township
14S
Range
20E
Section
26-27
Base
MDB&M

Notice of Determination

Approving Agency
SWRCB
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
1001 I St, 17th Floor, Sacramento, CA 95814

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.