Orange Center School District Water Consolidation Project

4 Documents in Project

Summary

SCH Number
2014051033
Lead Agency
Fresno, City of (City of Fresno)
Document Title
Orange Center School District Water Consolidation Project
Document Type
MND - Mitigated Negative Declaration
Received

Document Description
The City is proposing to construct, operate, and maintain approximately 2.8 miles of new water mains (pipelines) with associated connections to existing pipelines, tees, valves, and fire hydrants within the City of Fresno and unincorporated Fresno County. The City plans to construct 3,300 feet of 14-inch water main in S. Cherry Avenue from the current terminus of its water main, which is in the vicinity of Fresno Irrigation District (FID) North Central No. 26 canal, southward to the intersection with E. Central Avenue; 3,300 feet of 14-inch water main in S. East Avenue, from the current terminus of its water main, in the vicinity of FID's North Central No. 26 canal, southward to the intersection with E. Central Avenue; and 8,000 feet of 16-inch water main in E. Central Avenue from the intersection of S. Cherry Avenue eastward to connect with the City's existing water main in S. Cedar Avenue. Installation of these water pipelines would allow the Orange Center Elementary School to connect to the City of Fresno water system, allowing the school to replace its current use of bottled water and to cease using its on-site well (which would be abandoned). The project would also complete infrastructure improvements to ensure water system reliability and water service for properties along S. Cherry Avenue, E. Central Avenue, and S. East Avenue within the City's service area.

Contact Information
Sandra Brock
City of Fresno
1910 E. University Avenue
Fresno, CA 93703

559 621 8041

Location

Cities
Fresno
Counties
Fresno
Cross Streets
South Cherry Avenue / East Central Aveneue / South East Avenue
Zip
93706
State Highways
SR 99, 41
Railways
SPRR
Airports
No
Schools
Orange Center ES
Waterways
North Central Canal, South Central Canal, Colony Canal
Township
14S
Range
20E
Section
26-27
Base
MDB&M

Notice of Completion

Review Period Start
Review Period End
Development Type
Other (Water Pipelines)
Project Issues
Cumulative Effects Landuse Growth Inducing Wildlife Wetland/Riparian Water Supply Water Quality Vegetation Traffic/Circulation Toxic/Hazardous Solid Waste Soil Erosion/Compaction/Grading Sewer Capacity Septic System Schools/Universities Recreation/Parks Public Services Population/Housing Balance Noise Minerals Geologic/Seismic Forest Land/Fire Hazard Flood Plain/Flooding Biological Resources Archaeologic-Historic Air Quality Agricultural Land Aesthetic/Visual
Reviewing Agencies
Air Resources Board California Department of Parks and Recreation California Department of Public Health California Highway Patrol California Public Utilities Commission Caltrans, District 6 Department of Fish and Wildlife, Region 4 Department of Water Resources Native American Heritage Commission Office of Emergency Services, California Regional Water Quality Control Bd., Region 5 (Fresno) Resources Agency State Water Resources Control Board, Divison of Financial Assistance
Download CSV New Search