SART Phase III Trail Project (Streambed Alteration Agreement No. 1600-2017-0073-R6 [Revision 3])

5 Documents in Project

Summary

SCH Number
2014051019
Lead Agency
San Bernardino County
Document Title
SART Phase III Trail Project (Streambed Alteration Agreement No. 1600-2017-0073-R6 [Revision 3])
Document Type
NOD - Notice of Determination
Received
Posted
1/11/2019
Present Land Use
Flood Control Levee Floodway and Santa Ana River; Various Industrial and Commercial designations by the Cities of San Bernardino and Redlands
Document Description
CDFW has executed Streambed Alteration Agreement number 1600-2017-0073-R6, pursuant to section 1602 of thr Fish and Game Code to the project Applicant, San Bernardino County Deprtment of Public Works. The SART Phase III Trail Project includes the construction of an approximately .8 mile long pedestrian recreational trail along the southern boundary of the Santa Ana River. The project includes the construction five trail access ramps, four highway under crossings, rock slopeprotection and concrete slope paving, a concrete erosion control retaining wall, a 100x14 foot prefabricated, clear span steel bridge, a 4x6 foot concrete box culvert to replace an existing storm drain, and associated construction and griund-preparation activities. The construction of the project will permanently impact 1.57 acre of streambed, including 0.98 acre of riparian and stream-associated habitat and 0.59 acre of slopes, and temporarily impact 1.36 acre of streambed, of which 1.05 acre is riparian and stream associated habitat and 0.31 acre is slopes.

Contact Information

Name
Clair Ingel
Agency Name
CDFW, Inland Deserts Region
Contact Types
Lead/Public Agency

Location

Cities
Redlands, San Bernardino
Counties
San Bernardino
Cross Streets
Waterman Avenue / California Street
Total Acres
20
State Highways
I-10
Railways
BNSF
Airports
San Bernardino Int'l
Schools
No
Waterways
Santa Ana River
Township
1S
Range
4W
Base
SBB&M

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print