Santa Ana River Parkway - Geotech Boring Project (Lake or Streambed Alteration Agreement No. 1600-2019-0024-R5)

4 Documents in Project

Summary

SCH Number
2014051008
Lead Agency
Orange County
Document Title
Santa Ana River Parkway - Geotech Boring Project (Lake or Streambed Alteration Agreement No. 1600-2019-0024-R5)
Document Type
NOD - Notice of Determination
Received
Posted
7/30/2019

Document Description
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement number 1600-2019-0024-R5, pursuant to section 1602 of the Fish and Game Code to the project Applicant, County of Orange Public Works as represented by James Volz. The project proposes to conduct a geotechnical study designed to evaluate subsurface soils and conditions for the proposed projects associated with the Santa Ana River Trail Project. The geotechnical field investigation includes excavating twenty-two (22) exploratory boreholes to investigate subsurface conditions and collect samples of in-situsoils. Exploratory boreholes are planned at the proposed bridge locations, near and along the retaining wall alignments, and at the proposed staging area.

Contact Information
Eric Weiss
Department of Fish and Wildlife South Coast Region
3883 Ruffin Road
San Diego, CA 92123

Phone : (858) 467-4289

Location

Coordinates
33.874710°'"N 117.69733°'"W
Cities
Yorba Linda
Counties
Orange
Other Location Info
The project is located within the City of Yorba Linda, County of Orange. The streambed alteration/construction within Santa Ana River Channel, a tributary to the Pacific Ocean.

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
N/A

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination
2014051008_2019-0024 NOD   PDF 308 K
Download CSV New Search