Santa Ana River Parkway Extension Project

4 Documents in Project

Summary

SCH Number
2014051008
Lead Agency
Orange County
Document Title
Santa Ana River Parkway Extension Project
Document Type
NOD - Notice of Determination
Received
Posted
11/29/2016
Present Land Use
Various
Document Description
The proposed project includes the construction of a new Class I Bikeway, Riding and Hiking Trail, and associated amenities on the north and south banks of the Santa Ana River, between Gypsum Canyon Road Bridge and the Orange County boundary. A new Riding and Hiking Trail (approximately 1.75 miles) would be located parallel to the existing SAR Class I Bikeway that is located on the southern bank of the SAR, adjacent to SR-91. A new parallel Class I Bikeway and Riding and Hiking Trail would extend through a portion of the existing Green River Golf Course toward the BNSF Railroad, where the alignment would then follow the BNSF Railroad eastward to the Orange/San Bernardino County boundary. This new parallel Class I Bikeway and Riding and Hiking rail would start approx. 0.15 mile upstream from the Coal Canyon off-ramp in Chino Hills State Park. Additionally, a new parallel Class I Bikeway and Riding and Hiking trail would extend eastward from Gypsum Canyon Road Bridge on the northern bank of the SAR, adjacent to LA Palma Avenue. Three bridges (narrow/non-vehicular) will be constructed. Two of those bridges will cross the Santa Ana River and will connect the new Class I Bikeway, the new Riding and Hiking Trail, and the existing SAR Class I Bikeway. The proposed project will include other design features such as a staging area, trailheads, turnouts, and vista points.

Contact Information

Name
Jeff Dickman
Agency Name
Orange County Public Works
Contact Types
Lead/Public Agency

Location

Cities
Yorba Linda
Counties
Orange
Cross Streets
La Palma Avenue / Gypsum Canyon Road
Zip
92887
Total Acres
420
Parcel #
Various
State Highways
Hwy 241, 91, 71
Railways
BNSF
Airports
No
Waterways
Santa Ana River
Township
3S
Range
8W
Section
34-36

Notice of Determination

Approving Agency
County of Orange
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print